top of page

Design Verification and Validation Planning

  • Writer: Tyler Sangster
    Tyler Sangster
  • Jun 7, 2023
  • 7 min read

Understanding Design Verification and Validation in Modern Engineering

In the competitive landscape of product development, the difference between a successful market launch and a costly recall often comes down to one critical factor: robust design verification and validation (V&V) planning. For engineering firms across Atlantic Canada, from manufacturing facilities in Amherst to aerospace suppliers in Halifax, implementing comprehensive V&V protocols has become essential for delivering products that meet both regulatory requirements and customer expectations.

Design verification and validation represent two distinct yet interconnected processes that ensure your product not only meets its design specifications but also fulfills its intended purpose in real-world applications. While these terms are frequently used interchangeably, understanding their differences and implementing them effectively can save your organisation significant time, resources, and potential liability issues down the road.

Verification answers the question: "Are we building the product right?" Validation answers: "Are we building the right product?" Together, these processes form the backbone of quality assurance in product development, particularly in regulated industries such as medical devices, aerospace, automotive, and industrial equipment manufacturing.

The Critical Distinction Between Verification and Validation

Before developing an effective V&V plan, engineering teams must clearly understand what each process entails and how they complement each other throughout the product development lifecycle.

Design Verification Explained

Design verification involves objective evidence that specified requirements have been fulfilled. This process confirms that design outputs meet design inputs at each stage of development. Verification activities typically include:

  • Engineering analyses and calculations (stress analysis, thermal modelling, fatigue calculations)

  • Design reviews conducted at predetermined milestones

  • Prototype testing against documented specifications

  • Comparison with similar proven designs

  • Simulation and computer-aided engineering (CAE) results

  • Inspection and measurement of physical characteristics

For example, if your design specifications require a component to withstand 10,000 cycles of loading at 500 N without failure, verification testing would subject the component to these exact conditions and document whether it passes or fails. The Maritime climate, with its freeze-thaw cycles, salt air exposure, and humidity variations, often demands additional verification testing for products deployed in Nova Scotia and the broader Atlantic region.

Design Validation Explained

Validation ensures that the final product meets user needs and intended uses under actual or simulated use conditions. This process occurs on production-equivalent units and considers the complete product in its intended operating environment. Validation activities include:

  • User acceptance testing with representative end-users

  • Clinical trials or field trials under actual use conditions

  • Environmental testing (temperature extremes, humidity, vibration)

  • Reliability and durability testing over extended periods

  • Human factors evaluation and usability studies

  • Performance testing in simulated real-world scenarios

Developing a Comprehensive V&V Master Plan

A well-structured Verification and Validation Master Plan (VVMP) serves as the roadmap for all testing and evaluation activities throughout your project. This document should be created early in the design process and updated as the project evolves.

Essential Components of the VVMP

Your V&V Master Plan should include the following elements:

  • Scope and Objectives: Clearly define what the plan covers, including product boundaries, regulatory requirements, and success criteria

  • Regulatory Framework: Identify all applicable standards and regulations (ISO 13485, Health Canada requirements, CSA standards, etc.)

  • Requirements Traceability Matrix: Link each requirement to its verification and validation method

  • Test Strategy: Define the overall approach, including test phases, acceptance criteria, and statistical requirements

  • Resource Planning: Identify equipment, facilities, personnel, and budget requirements

  • Schedule and Milestones: Establish timeline with key decision points and review gates

  • Risk Assessment: Document potential risks and mitigation strategies

For organisations operating in Nova Scotia's growing technology and manufacturing sectors, the VVMP should also consider local testing capabilities, proximity to specialised laboratories, and potential partnerships with research institutions such as Dalhousie University or the National Research Council facilities in Atlantic Canada.

Requirements Traceability

One of the most critical aspects of V&V planning is establishing clear traceability between requirements and test methods. A Requirements Traceability Matrix (RTM) should map each design requirement to:

  • The source of the requirement (customer needs, regulatory standards, internal specifications)

  • The verification method to be used (test, analysis, inspection, demonstration)

  • The validation approach and acceptance criteria

  • The responsible party and scheduled completion date

  • The actual results and evidence of completion

This traceability ensures that no requirements fall through the cracks and provides auditable documentation for regulatory submissions and quality system audits.

Verification Methods and Test Planning

Selecting appropriate verification methods requires balancing thoroughness with efficiency. Not every requirement needs physical testing; sometimes analysis or inspection provides adequate evidence at lower cost.

The Four Primary Verification Methods

Test: Physical measurement or functional operation of the product to determine compliance. Testing provides the highest confidence level but is typically the most resource-intensive method. For products used in Atlantic Canada's marine and offshore industries, testing should include exposure to salt spray (per ASTM B117), thermal cycling from -40°C to +85°C, and vibration profiles representative of maritime applications.

Analysis: Technical evaluation using mathematical models, simulations, or engineering judgement. Finite element analysis (FEA) for structural verification, computational fluid dynamics (CFD) for thermal performance, and tolerance stack-up analysis are common examples. Analysis is particularly valuable early in development when physical prototypes are not yet available.

Inspection: Visual examination or measurement to verify physical characteristics, dimensions, and materials. Inspection is appropriate for requirements related to manufacturing quality, material identification, and workmanship standards.

Demonstration: Qualitative observation of product operation without measurement. Demonstration is suitable for verifying functional requirements that are difficult to quantify, such as ease of assembly or visual indicators.

Establishing Sample Sizes and Statistical Confidence

Determining appropriate sample sizes for verification testing requires careful consideration of:

  • The criticality of the requirement being verified

  • Historical data from similar products or processes

  • Regulatory requirements (some standards specify minimum sample sizes)

  • Desired confidence level and reliability targets

  • Available budget and schedule constraints

For reliability demonstration, the required sample size depends on the target reliability, confidence level, and number of allowable failures. A common approach uses the formula: n = ln(1-C) / ln(R), where n is the sample size, C is the confidence level, and R is the reliability target. For a 95% confidence that reliability exceeds 90% with zero failures allowed, you would need 29 samples.

Validation Protocol Development

Validation protocols must be carefully designed to demonstrate that the product meets user needs under realistic conditions. This requires understanding not just the technical specifications but also how the product will actually be used.

User Needs and Intended Use Analysis

Effective validation begins with thorough documentation of user needs and intended use conditions. This analysis should consider:

  • Primary users and their technical capabilities

  • Operating environments (indoor/outdoor, temperature range, cleanliness requirements)

  • Frequency and duration of use

  • Maintenance and service requirements

  • Potential misuse scenarios that must be addressed

  • Interface with other equipment or systems

For products deployed across Atlantic Canada, validation should address the unique environmental challenges of the Maritime provinces, including coastal humidity levels averaging 75-85%, winter temperatures reaching -25°C in inland areas, and the corrosive effects of road salt and marine environments.

Validation Test Design

Validation tests should simulate actual use conditions as closely as possible. Key considerations include:

Environmental Conditions: Test under the full range of expected operating conditions, including worst-case combinations of temperature, humidity, and other environmental factors.

User Population: Include representative users in validation testing, considering the full range of user characteristics (experience level, physical capabilities, etc.).

Use Duration: Validation should cover the expected product lifetime, potentially using accelerated testing methods where appropriate.

Interfacing Systems: Test the product in conjunction with any systems it must interface with, including power supplies, communication networks, or complementary equipment.

Risk-Based Approaches to V&V Planning

Modern V&V planning increasingly adopts risk-based approaches that focus resources on the most critical aspects of the design. This methodology aligns with international standards such as ISO 14971 for medical devices and similar risk management frameworks.

Integrating Risk Analysis with V&V

Your risk analysis should inform V&V planning in several ways:

  • Higher-risk functions require more rigorous verification and validation

  • Risk controls identified in your risk analysis must be verified as effective

  • Residual risk levels should be validated as acceptable

  • V&V activities may identify new risks requiring additional analysis

For each identified hazard, the V&V plan should specify how the effectiveness of risk controls will be demonstrated. This creates a closed-loop system where risks drive V&V requirements, and V&V results inform risk assessment updates.

Prioritising V&V Activities

Not all requirements carry equal weight. A risk-based prioritisation approach considers:

  • Safety implications of requirement non-conformance

  • Regulatory criticality and potential for audit scrutiny

  • Customer impact and satisfaction factors

  • Likelihood of design or manufacturing variability

  • Historical issues with similar products or technologies

Documentation and Evidence Management

Comprehensive documentation is essential for demonstrating V&V completion and supporting regulatory submissions. Your documentation strategy should address record creation, review, approval, storage, and retrieval.

Essential V&V Documentation

A complete V&V documentation package typically includes:

  • V&V Master Plan and any amendments

  • Individual test protocols with acceptance criteria

  • Test reports with raw data and analysis

  • Deviation reports and resolution documentation

  • Requirements Traceability Matrix showing completion status

  • Summary reports for regulatory submissions

  • Certificates of calibration for test equipment

Canadian regulatory requirements, including those administered by Health Canada for medical devices and Transport Canada for transportation equipment, mandate specific documentation retention periods, typically ranging from 5 to 25 years depending on the product type.

Partner with Sangster Engineering Ltd. for Your V&V Needs

Developing and executing effective design verification and validation plans requires expertise, experience, and attention to detail. At Sangster Engineering Ltd., we bring decades of engineering experience to help organisations across Nova Scotia and Atlantic Canada navigate the complexities of V&V planning.

Our team understands the unique challenges faced by Maritime manufacturers and technology developers, from the environmental demands of our coastal climate to the regulatory requirements of Canadian and international markets. Whether you are developing medical devices, industrial equipment, or consumer products, we can help you create V&V plans that satisfy regulatory requirements while optimising development timelines and budgets.

Contact Sangster Engineering Ltd. today to discuss how we can support your product development initiatives with comprehensive design verification and validation planning services. Let us help you bring your innovations to market with confidence, backed by rigorous engineering processes and documentation that stands up to the most demanding scrutiny.

Partner with Sangster Engineering

At Sangster Engineering Ltd. in Amherst, Nova Scotia, we bring decades of engineering experience to every project. Serving clients across Atlantic Canada and beyond.

Contact us today to discuss your engineering needs.

Recent Posts

See All
Technical Documentation Standards

Discover essential technical documentation standards that streamline product development, improve team collaboration, and ensure consistent, high-quality documentation.

 
 
 
Design for Environment and Sustainability

Discover how Design for Environment principles drive sustainable product development. Learn eco-friendly strategies to reduce waste and create greener products.

 
 
 
House of Quality Development

Discover how House of Quality Development transforms customer needs into product features. Learn QFD techniques to improve your product development process.

 
 
 

Comments


Sangster Engineering

©2023 by Sangster Engineering 

bottom of page